Project completed

2R Engenharia

Construction management platform with predictive AI for scheduling and IoT inventory control.

Civil Construction/AI-Powered Management System
2R Engenharia
ScopeAI-Powered Management System

Before and after

Before

  • 12 simultaneous sites under manual control
  • Average delay of 45 days per project

After

-65%construction delays
-42%material waste
ROI in 3 months

Measured against the baseline of the process before the project.

Project summary

Twelve simultaneous construction sites managed with manual inventory control, outdated schedules and fragmented communication between teams, producing an average delay of 45 days per project. We built an integrated web platform with predictive AI for schedule management, automated IoT inventory control and real-time dashboards with intelligent risk alerts.

Engineering notes

Schedules were outdated, with no visibility of risk before the delay actually happened.

SolutionPredictive AI flags delay risk in advance, with an alert on the dashboard.

Site inventory tracked on paper, which generated waste.

SolutionAutomated IoT control, integrated with each site schedule.